My friend Bill and I are often sent to Heating and A/C installs together. Bill and I are a fantastic team. Both of us work well together and the people I was with and I regularly seem to be in sync. Our average Heating and A/C plan install times are lower than anyone else in our company. Last year alone, Bill and I installed 342 Heating and A/C systems. That’s a lot, considering the fact that the people I was with and I only work 5 or 6 days each week. Both of us often perform more than one Heating and A/C install in a single morning, and during the months of June and July, the people I was with and I are scheduled for numerous or three upgrades in one morning. By the end of July, all the people believe if they are going to experience problems with the climate control system. The end of the summer time is slower than the first numerous months. The Winter climate is rather mild in this area, so the people I was with and I hardly ever get overwhelmed during the cold months. Last month, Bill and I are worked on a entirely special project. Both of us helped oversee the upgrade of an advanced air filtration plan at the microbrewery. Bill and I helped another team of Heating and A/C installers. Together, the people I was with and I installed an intricate plan throughout the building. The HVAC plan has an advanced air filtration feature, to remove any types of particles and pollutants that could cause harm to the coors batches. Bill and I even gained a tour of the brewery, when the Heating and A/C upgrade was completed. They gave us numerous cases of sample brews, and the people I was with and I could not say no. That was the most fun I ever had during an Heating and A/C upgrade task.